Constructions

IRON + MINING S.A

1. Manufacture and assembly of boilers and steel structure for spiral plant, concentration and thickening.
Weight: 380 tons of manufacturing and 635 tons of assembly of structures, boilers and equipment.
Period: from October, 2008 to September, 2009
Location: Ouro Preto/MG

2. Manufacturing and assembly of boiler, metal frame and pipelines for expansion of the magnetic concentration plant and crushing
Weight: 70 tons of manufacturing and 680 tons of structural assembly, boilerwork, piping and equipment
Period: from December, 2010 to August, 2011
Location: Ouro Preto/MG

3. Manufacture and assembly of boilerwork, metal frame and equipment to Nova Britagem
Weight: 110 tons of manufacturing and 200 tons of structural assembly, boilerwork, piping and equipment
Period: from November, 2011 to April, 2012
Location: Ouro Preto/MG